Skip to content
Marvex

Measure

DORA Metrics

Four numbers, computed from the events your tooling already emits. No spreadsheets, no self-reported estimates, and no metric that a team can improve by typing faster.

Marvex computes the four DORA metrics — deployment frequency, lead time for changes, change failure rate and mean time to recovery — from your GitHub, GitLab and incident data, scoped per team and per repository.

A laptop screen showing delivery analytics charts and time-series data
4
DORA metrics computed from your own delivery data
2
Deployment detection modes: merge to production branch, or CI/CD workflow run
Throughput + stability
DORA pairs speed measures with failure measures so neither can be optimised alone
Source: DORA / Accelerate research programme

What it does

Capabilities

  • Deployment frequency from merges to a production branch (PR_MERGE) or from CI/CD workflow runs (WORKFLOW)
  • Lead time for changes, decomposed into the pull-request stages that make it up
  • Change failure rate as a ratio of failure-linked deployments to total deployments
  • Mean time to recovery from incident open and resolve timestamps
  • Per-team, per-repository and org-wide roll-ups of all four metrics
  • Trend comparison across arbitrary date ranges, not just the current month
  • GitHub and GitLab as deployment sources, configured independently per repo
  • Org-scoped data isolation — every query is filtered by tenant

What the four DORA metrics actually measure

DORA — the DevOps Research and Assessment programme behind the Accelerate research and the annual State of DevOps reports — settled on four measures because they are the smallest set that cannot be gamed in isolation. Two describe throughput: how often you ship, and how long a change takes to get from a developer's machine into production. Two describe stability: how often a change breaks something, and how long it takes you to recover when it does.

The pairing is the point. A team can raise deployment frequency by shipping recklessly, but change failure rate will move against them. A team can drive change failure rate to zero by shipping almost nothing, but deployment frequency and lead time will expose it. Read as a set of four, they describe a delivery system. Read one at a time, they describe nothing and invite exactly the behaviour you did not want.

Marvex computes all four from timestamps in systems you already run — commits, pull requests, workflow runs, incidents — rather than from anything a person types into a form. That matters because a self-reported metric measures reporting discipline as much as it measures delivery.

  • Deployment frequency — how often code reaches production
  • Lead time for changes — first commit on a change to that change running in production
  • Change failure rate — the share of deployments that result in a failure requiring remediation
  • Mean time to recovery — how long service is degraded before it is restored

How Marvex decides what counts as a deployment

Every DORA implementation has to answer one awkward question before it can produce a single number: what is a deployment in your organisation? Teams answer this differently, and a tool that assumes one answer produces confidently wrong data for everyone else.

Marvex supports two detection modes, configured per repository. In PR_MERGE mode, a deployment is recorded when a pull request is merged into a branch you have designated as production — the right model for trunk-based teams whose merge is effectively their release. In WORKFLOW mode, a deployment is recorded when a named CI/CD workflow run completes — the right model for teams whose merge and release are separate events, where merging to main is not yet shipping.

These are handled by distinct service paths rather than by a shared heuristic, because the two modes carry different data. A workflow run knows its own conclusion and duration; a merge knows its pull request, its commits and its reviewers. Getting the mode right for each repository is the single highest-leverage configuration decision on the platform: pick the wrong one and deployment frequency and lead time will both be measuring the wrong event, consistently and invisibly.

  • PR_MERGE — merge into a configured production branch counts as a deployment
  • WORKFLOW — completion of a configured CI/CD workflow run counts as a deployment
  • Mode is set per repository, so a monorepo and a service repo can differ
  • Mixed estates are normal: GitHub Actions in one repo, GitLab pipelines in another

Lead time for changes, and why it is not cycle time

Lead time for changes measures the clock from the first commit on a change to that change being live. Cycle time, as most engineering teams use the word, measures a narrower window: the life of the pull request. The two are routinely conflated and the difference is usually where the real delay is hiding.

A team can have an excellent pull-request cycle time — quick reviews, fast merges — and a poor lead time, because merged code sits waiting for a release train. Another team can merge slowly but deploy on merge, and see the reverse. Marvex reports both, and decomposes lead time into the stages beneath it, so the conversation moves from "our lead time is bad" to "our lead time is bad because pickup takes a day and a half".

Because lead time is composed of stages, it is also the metric that responds most reliably to process change. Shortening review pickup, reducing pull-request size, or removing a manual release gate each shows up in a specific stage rather than as an unattributable improvement in a single number.

Change failure rate and MTTR come from incidents

The stability half of DORA depends on knowing when something broke. Marvex sources incidents from your incident data and uses their timestamps for both stability metrics: mean time to recovery is derived from when an incident was opened and when it was resolved, and change failure rate is the proportion of deployments associated with a failure that required remediation.

The honest caveat, which every DORA implementation shares and few state, is that change failure rate is only as good as your incident hygiene. If failures are fixed quietly and never recorded, the metric will look excellent and mean nothing. Marvex therefore treats incident coverage as part of the setup rather than an afterthought, and reports the deployment and incident counts underneath the ratio so a suspiciously low change failure rate can be recognised as a data problem rather than celebrated as a result.

MTTR has a related caveat: it is an average over a small number of events for most teams, so a single long incident dominates a quarter. Read it alongside the incident count, and prefer the distribution to the mean when you have enough events to see one.

Reading the numbers without gaming them

The DORA research groups teams into performance bands, and the temptation is to treat the band as a target. It is more useful as a diagnostic. The research consistently finds that throughput and stability move together rather than trading off — the higher-performing groups are better at both — which is the finding that makes the four metrics worth tracking at all.

Two rules keep the data honest. First, never use DORA metrics to compare individuals. They are system metrics: deployment frequency describes a delivery pipeline, not a person, and attributing it to an individual reliably produces smaller pull requests that are not any better. Second, compare a team against its own trend rather than against another team. Different services have different risk profiles, and a payments service that deploys less often than an internal tool is not underperforming.

Marvex supports this by defaulting to per-team trends over arbitrary date ranges, and by showing the counts underneath every ratio so a metric that moved because the denominator collapsed does not read as an improvement.

  • Compare a team against its own history, not against another team
  • Read all four together; a single metric in isolation is an invitation to game it
  • Check the counts under every ratio before believing a change failure rate
  • Never attribute a system metric to an individual

Where the data comes from

Marvex connects to GitHub and GitLab for repositories, pull requests, commits and CI/CD runs; to Jira or to SALT, the built-in tracker, for issues and sprints; and to your incident data for the stability metrics. A background sync worker pulls from these providers on a schedule and writes into the platform's own store, so dashboards read from local data rather than hitting provider APIs on every page load.

Everything is multi-tenant and org-scoped: every query is filtered by organisation, and integration tokens are encrypted at rest. The practical consequence is that DORA metrics stay available and fast even when a provider is rate-limiting you, and that a metric can be recomputed over history when you change a repository's deployment mode.

Frequently asked questions

What are the four DORA metrics?

The four DORA metrics are deployment frequency (how often an organisation ships to production), lead time for changes (the time from first commit on a change to that change running in production), change failure rate (the proportion of deployments that cause a failure requiring remediation) and mean time to recovery (how long it takes to restore service after a failure). They come from the DORA / Accelerate research programme, and are designed to be read as a set: two measure throughput, two measure stability, so neither speed nor safety can be optimised at the expense of the other.

How does Marvex decide what counts as a deployment?

Marvex supports two deployment detection modes, configured per repository. In PR_MERGE mode a deployment is recorded when a pull request is merged into a branch designated as production, which suits trunk-based teams where merging is effectively releasing. In WORKFLOW mode a deployment is recorded when a configured CI/CD workflow run completes, which suits teams whose release is a separate step from the merge. Because the mode is set per repository, a single organisation can mix both across its estate.

What is the difference between lead time for changes and cycle time?

Lead time for changes measures from the first commit on a change to that change running in production. Cycle time, as engineering teams normally use the term, measures the narrower pull-request window — typically from pull request opened to merged. A team can have a fast cycle time and a slow lead time if merged code waits for a release train, or the reverse if reviews are slow but every merge deploys. Marvex reports both, so it is clear whether delay sits inside code review or after it.

How is change failure rate calculated?

Change failure rate is the proportion of deployments that result in a failure requiring remediation — a rollback, a hotfix or a fix-forward. Marvex derives it by relating incident records to deployments over the same period, so the ratio has a real numerator and denominator rather than an estimate. The metric depends entirely on incident coverage: if production failures are fixed without ever being recorded as incidents, change failure rate will look excellent and tell you nothing, which is why the underlying deployment and incident counts are shown alongside the ratio.

Which tools does Marvex need to compute DORA metrics?

At minimum, a source control connection — GitHub or GitLab — which supplies repositories, pull requests, commits and CI/CD workflow runs. That is enough for deployment frequency and lead time for changes. The two stability metrics, change failure rate and mean time to recovery, additionally need incident data so that failures and recovery times are known. Jira or the built-in SALT tracker can be connected for issue and sprint context, but is not required for DORA itself.

Can DORA metrics be used to evaluate individual developers?

No. All four DORA metrics describe a delivery system, not a person. Deployment frequency is a property of a pipeline and a team's release process; lead time is affected by review capacity, batch size and release cadence far more than by any individual. Using them for individual evaluation reliably produces defensive behaviour — smaller pull requests that are not better, work split to inflate counts — and destroys the signal. Marvex is built around team and organisation scopes for this reason.

How far back can Marvex compute DORA metrics?

As far back as the connected providers expose history. Marvex syncs repositories, pull requests, commits and workflow runs into its own store, so once a backfill has completed you can compare arbitrary date ranges rather than being limited to a rolling window. This also means metrics can be recomputed over past periods when a repository's deployment detection mode changes, instead of leaving a discontinuity in the trend.

Do DORA metrics work for teams that deploy on a fixed release schedule?

Yes, though the numbers read differently. A team on a two-week release train will show low deployment frequency and long lead time by construction, and the useful signal is in the components: how long a change waits after merge before it ships. Marvex separates the pull-request stages from the post-merge wait, so a scheduled-release team can see how much of its lead time is engineering time and how much is queue time before the next release window.

Marvex

See it on your own delivery data

Connect GitHub, GitLab or Jira and Marvex builds your DORA, cycle-time and sprint views from the history you already have.