SALT Issue Tracking

An issue tracker that lives in the same system as your delivery metrics, so planning data and engineering data do not have to be reconciled across two products.

SALT (Smart Agile Lifecycle Tracker) is the issue tracker built into Marvex, providing issues, boards, backlogs, sprints, configurable workflows, issue history and outbound webhooks as an alternative to Jira.

A planning board covered in sticky notes during a team planning session
Issues → boards → sprints
The full planning loop, inside the analytics platform
Every field change
Issue history records what changed, by whom and when

What it does

Capabilities

  • Issues with configurable types, statuses and fields
  • Boards for in-flight work, with per-board configuration
  • Backlogs for work that is not yet scheduled
  • Sprints, including sprint start, close and carry-over
  • Configurable workflows — the status transitions an issue is allowed to make
  • Full issue history: every field change, recorded with who and when
  • Outbound webhooks on issue and sprint events for downstream automation
  • Runs inside Marvex, so sprint data and delivery data share one store

What SALT is

SALT — Smart Agile Lifecycle Tracker — is the issue tracker built into Marvex. It provides the objects an agile team actually uses: issues, boards, backlogs, sprints, workflows that define which status transitions are legal, a full history of every field change, and webhooks so that other systems can react to what happens.

It exists for a specific reason. Engineering intelligence needs planning data — what was committed, what changed mid-sprint, what carried over — and that data normally lives in a separate product that has to be synced, mapped and reconciled. When the tracker is in the same system as the delivery metrics, sprint analytics stop being an integration problem.

SALT is an alternative to Jira, not a replacement for it in every case. Marvex integrates with Jira for organisations that already run it and have no reason to move. SALT is for teams who would rather not run two systems, or who are choosing a tracker now.

  • Issues with configurable types, statuses and fields
  • Boards and backlogs
  • Sprints with start, close and carry-over
  • Workflows defining legal status transitions
  • Issue history for every field change
  • Outbound webhooks on issue and sprint events

Boards, backlogs and the difference between them

The distinction between a board and a backlog is not cosmetic; it is about commitment. The board holds work the team has committed to and is actively moving. The backlog holds everything that has been captured but not yet scheduled, and its job is to be a durable place for ideas rather than a queue anyone promises to finish.

Teams that collapse the two — running everything on one enormous board — lose the ability to answer the only question that matters at planning time: what did we agree to do, and how much of it did we finish? Teams that treat the backlog as a commitment queue end up with a document that generates guilt and no decisions.

SALT keeps them separate, and the sprint is the mechanism that moves work from one to the other. Because sprint boundaries are recorded, what was committed at the start and what was present at the end are both known, which is what makes scope change measurable rather than remembered.

Workflows: the transitions an issue may make

A workflow defines the statuses an issue can be in and which moves between them are allowed. This is the part of a tracker that quietly determines how much your data is worth. A workflow with three statuses gives you very little insight into where work waits; a workflow with twenty gives you precise data that nobody maintains accurately, which is worse.

The practical guidance is to model the states where work genuinely queues, and nothing else. If work waits for review, "In review" earns its place. If nothing ever sits in "Ready for QA" for more than an hour, that status is recording a moment rather than a state and is costing more in transitions than it returns in insight.

SALT makes workflows configurable per organisation so this can be tuned deliberately. Every transition is written to issue history, so once the workflow reflects real waiting states, time-in-status becomes a genuine measurement of where delivery is blocked.

Issue history is the data that makes analytics possible

SALT records every field change on an issue with who made it and when. That log is unglamorous and it is where most of the analytical value comes from, because almost every interesting planning question is a question about change over time rather than about current state.

When was this actually started, as opposed to when was it created? How long did it sit in review? Was it in the sprint on day one, or added on day six? Did its estimate change after work began? None of these can be answered from the current state of an issue, and all of them can be answered from its history.

This is also what makes scope-change reporting trustworthy. A team can always reconstruct a story about why a sprint missed; the history says what actually happened, including the items added after the commitment was made.

Webhooks and downstream automation

SALT emits outbound webhooks on issue and sprint events, so other systems can react without polling. The usual uses are notifying a channel when a high-priority issue is raised, kicking off automation when a sprint closes, or keeping a downstream system in step with planning changes.

Webhook delivery includes retry handling, and target URLs are validated to block requests to non-public addresses. That guard exists because a webhook feature that will call any URL an authenticated user supplies is a server-side request forgery vector aimed straight at internal infrastructure, and the restriction is worth stating plainly so it is not mistaken for a bug when an internal address is refused.

Subscriptions are configured per organisation, and their secrets are stored encrypted.

  • Issue events and sprint events
  • Retry handling on delivery failure
  • Non-public target addresses are blocked by design
  • Per-organisation subscriptions with encrypted secrets

Choosing between SALT and Jira

If your organisation already runs Jira, has years of history in it, and has automation and reporting built around it, connect it. Marvex reads issues, sprints and boards from Jira and computes sprint analytics from that data. Migrating a working tracker to gain reporting you can have anyway is rarely a good trade.

SALT is the better choice when you are standing up a new tracker, when the overhead of running and administering a separate planning product is not justified by the value you get from it, or when the value of planning and delivery data sharing one store outweighs the features of a mature dedicated tracker.

The honest framing is that Jira is a deeper product with a larger ecosystem, and SALT is a focused one that lives where your delivery metrics already are. Both are supported paths, and the choice should be made on which of those two things your team needs more.

Frequently asked questions

What is SALT?

SALT — Smart Agile Lifecycle Tracker — is the issue tracker built into Marvex. It provides issues with configurable types and fields, boards, backlogs, sprints, workflows that define which status transitions are permitted, a full history of every field change, and outbound webhooks on issue and sprint events. It is an alternative to running a separate planning tool, and it lives in the same system as Marvex's delivery analytics so planning and engineering data do not have to be reconciled across products.

Is SALT a replacement for Jira?

It is an alternative, not a required replacement. Marvex integrates with Jira and computes sprint analytics from Jira issues, sprints and boards, so an organisation already invested in Jira should keep it. SALT is the better fit when you are choosing a tracker now, when administering a separate planning product is not justified by what you get from it, or when having planning and delivery data in one store matters more than the depth of a mature dedicated tracker.

What does SALT record in issue history?

Every field change on an issue, with who made it and when. That log is what makes planning analytics possible, because most useful questions are about change over time rather than current state: when work was actually started as opposed to created, how long it sat in review, whether it was in the sprint on day one or added on day six, and whether its estimate changed after work began. None of those can be answered from an issue's current state.

How should a SALT workflow be configured?

Model the states where work genuinely queues, and nothing else. A workflow with too few statuses cannot show you where delivery waits; one with too many produces precise data nobody maintains accurately, which is worse. If work really waits for review, an "In review" status earns its place; if nothing ever sits in a status for more than an hour, that status records a moment rather than a state and costs more in transitions than it returns. Every transition is written to issue history, so a well-chosen workflow turns time-in-status into a real measurement.

What events do SALT webhooks fire on?

SALT emits outbound webhooks on issue events and sprint events, so downstream systems can react without polling — notifying a channel when a high-priority issue is raised, or triggering automation when a sprint closes. Delivery includes retry handling, subscriptions are configured per organisation, and their secrets are stored encrypted. Target URLs that resolve to non-public addresses are refused by design, because an unrestricted webhook target is a server-side request forgery path into internal infrastructure.

What is the difference between a board and a backlog in SALT?

A board holds work the team has committed to and is actively moving; a backlog holds everything captured but not yet scheduled. Keeping them separate is what makes the planning question answerable — what did we agree to do, and how much did we finish. The sprint is the mechanism that moves work from backlog to board, and because sprint boundaries are recorded, what was committed at the start and what was present at the end are both known, which is what makes scope change measurable rather than remembered.

Does SALT data feed Marvex analytics automatically?

Yes. Because SALT runs inside Marvex, its issues, sprints and history are already in the same store as the pull request, deployment and incident data, so sprint analytics and reports read from it without an integration, a mapping step or a sync delay. The same analytics are available from Jira when Jira is the connected source of planning data.

Marvex

See it on your own delivery data

Connect GitHub, GitLab or Jira and Marvex builds your DORA, cycle-time and sprint views from the history you already have.