Glossary
Every metric, defined plainly
The delivery vocabulary, one self-contained sentence per term. Agree the definition before you agree the target — most arguments about a dashboard are really arguments about where a clock starts.
A glossary of engineering delivery measurement terms, each defined in one self-contained sentence: the four DORA metrics, the stages of pull request cycle time, flow vocabulary such as work in progress and batch size, sprint terms, and incident terms.
Jump to a letter
30 terms. Each links to a fuller page with how the term is used in practice and which measures it is commonly confused with.
B
Batch size
Batch size is the amount of change bundled into a single unit of delivery — a pull request, a release or a deployment — and reducing it is the mechanism behind most of the improvements attributed to continuous delivery.
Blameless retrospective
A blameless retrospective is a review of an incident or a period of work conducted on the premise that everyone acted reasonably given the information they had, so the discussion focuses on the system rather than on individual fault.
Burndown chart
A burndown chart plots the work remaining in a sprint or project against time, so that the actual rate of completion can be compared with the rate required to finish on schedule.
C
Change failure rate
Change failure rate is a DORA metric expressing the percentage of deployments to production that result in a degraded service and require remediation such as a hotfix, rollback, patch or roll-forward.
Cycle time
Cycle time is the elapsed time from work starting to that work being finished, and in engineering analytics it most often means the pull-request lifecycle from first commit or open through review, rework and merge.
D
Deployment frequency
Deployment frequency is a DORA metric that counts how often an organisation successfully releases code to production, usually expressed as deployments per day or per week for a given service or team.
Deployment window
A deployment window is a defined period during which releases to production are permitted, and its inverse — a code freeze — is a period during which they are not.
DevEx (developer experience)
DevEx is the lived experience of the people building software — the friction, feedback loops and cognitive load involved in getting a change from idea to production — and it is measured through a combination of system data and direct feedback.
DORA
DORA (DevOps Research and Assessment) is the research programme whose four key metrics — deployment frequency, lead time for changes, change failure rate and time to restore service — are the most widely used measures of software delivery performance.
E
Engineering intelligence
Engineering intelligence is the practice of using data already produced by development tooling — source control, CI/CD, issue trackers and incident systems — to understand and improve how software gets delivered.
F
Flow efficiency
Flow efficiency is the percentage of an item’s total elapsed time that was spent actively worked on rather than waiting, calculated as active time divided by total cycle time.
I
Incident
An incident is an unplanned disruption or degradation of a production service that requires a response to restore normal operation, and incident timestamps are the source data for mean time to recovery and change failure rate.
L
Lead time for changes
Lead time for changes is a DORA metric measuring the elapsed time from a code change being committed to that change running in production, capturing everything the change waits for along the way.
M
Merge time
Merge time is the interval between a pull request being approved and it actually landing on the target branch, and it isolates the delay caused by process and tooling rather than by review.
MTTR (mean time to recovery)
MTTR is the average elapsed time between a production failure being detected and service being restored, and it is the DORA metric that describes how quickly an organisation recovers rather than how rarely it fails.
P
Pickup time (first response time)
Pickup time is the interval between a pull request becoming ready for review and the first substantive response from a reviewer, and it is usually the largest pure queue in the code-review process.
Postmortem
A postmortem is a written analysis produced after an incident that records what happened, how it was detected and resolved, what contributed to it, and what will be changed as a result.
Pull request size
Pull request size is the amount of change a single pull request contains, usually counted as lines added and removed plus files touched, and it is the variable that most reliably predicts how long that change takes to review and merge.
Q
Queue time
Queue time is the portion of delivery time during which an item is waiting for someone or something to become available rather than being actively worked on, and it typically dominates software cycle time.
R
Review depth
Review depth describes how substantively a pull request was reviewed — measured through signals such as number of reviewers, review comments, and rounds of feedback — as opposed to whether it merely received an approval.
Review time
Review time is the portion of a pull request lifecycle spent in active review, from the first reviewer response until the change is approved or otherwise cleared to merge.
Rework time
Rework time is the part of a pull request lifecycle spent changing code after review has begun, in response to review feedback, failing checks or a change of approach.
S
Scope change
Scope change is work added to or removed from a sprint after it has started, and measuring it separates a team that failed to deliver from a team whose commitment was changed underneath it.
SPACE framework
The SPACE framework is a model for measuring developer productivity across five dimensions — satisfaction and well-being, performance, activity, communication and collaboration, and efficiency and flow — on the principle that no single metric can capture it.
Sprint carry-over
Sprint carry-over is work that was committed to in a sprint but not completed within it and therefore moves into the next sprint, and a persistently high rate of it indicates a planning or flow problem rather than a lack of effort.
Story points
Story points are a unit of relative estimation used to express how large a piece of work is compared with other work on the same team, deliberately abstracting away from hours or days.
T
Throughput
Throughput is the number of work items a team completes in a given period — pull requests merged, issues closed or deployments shipped — counted as items rather than estimated effort.
Trunk-based development
Trunk-based development is a branching model in which developers integrate small changes into a single shared mainline at least daily, using short-lived branches or none at all instead of long-running feature branches.
V
Velocity
Velocity is the amount of estimated work, usually measured in story points, that a team completes in a sprint, and it is intended as a planning input for that team rather than as a measure of performance.
W
WIP (work in progress)
Work in progress is the amount of work a team has started but not finished at a given moment, and limiting it is the most direct way to shorten cycle time without changing capacity.
Frequently asked questions
What is the Marvex engineering metrics glossary?
The Marvex engineering metrics glossary is a set of plain-language definitions for the vocabulary used in software delivery measurement: the four DORA metrics (deployment frequency, lead time for changes, change failure rate and mean time to recovery), the stages of pull request cycle time (pickup, review, rework and merge), flow terms such as work in progress, batch size, queue time and flow efficiency, agile terms such as velocity, story points, scope change and sprint carry-over, and incident terms such as postmortem and blameless retrospective. Each entry leads with one self-contained sentence, so it can be quoted without the rest of the page.
Why do two teams get different numbers for the same metric?
Because most delivery metrics are definitions before they are measurements. "Deployment" can mean a merge into a production branch or a run of a CI/CD workflow, and the two produce very different deployment frequencies for the same team. "Lead time" can start at first commit, at pull request creation, or at the moment an issue moved into progress. "Change failure" can mean an incident somebody declared or an observable remediating action such as a revert or hotfix. None of these choices is wrong, but comparing two teams — or two tools — without matching the definitions first produces a difference that is entirely an artefact of configuration.
What is the difference between lead time and cycle time?
Lead time for changes, as the DORA research programme defines it, is the elapsed time from code committed to that code running in production. Cycle time in common industry usage is narrower and pull-request-centred: the time from first commit on a branch to that pull request being merged, usually broken into first-response or pickup time, review time, rework time and merge time. The two overlap but are not interchangeable, and blending them into a single number is the most common reason a delivery metric stops being trusted.
Are these definitions specific to Marvex?
No. The definitions here follow common industry usage and, for the four delivery metrics, the DORA research programme published through the State of DevOps reports and the book Accelerate. Where Marvex has to make a measurement choice that the industry leaves open — for example whether a deployment is detected as a merge into a production branch (PR_MERGE) or as a CI/CD workflow run (WORKFLOW) — the entry says so explicitly rather than presenting one option as the definition.
How should a glossary term be used in a team discussion?
Agree the definition before agreeing the target. Most disagreements about delivery data are disagreements about where a clock starts or what counts as a failure, not about the data itself, and they surface as an argument about whether the dashboard is right. Writing the chosen definition down — including the edge cases, such as whether a redeploy of an unchanged artefact counts, or whether a reverted change counts against the sprint — is what makes a number comparable from one quarter to the next.
Do any of these metrics measure individual developer performance?
None of them do, and the DORA research programme is explicit that its four metrics describe a delivery system rather than a person. Deployment frequency, lead time, change failure rate and recovery time all move when queueing, batch size and feedback speed change, which are properties of how a team works rather than of how hard any individual worked. Metrics such as pull request count or lines changed, which do attach to individuals, are poor measures of contribution and reliably change behaviour in the direction of the measure rather than in the direction of delivery.
Marvex
Turn the definitions into numbers
Marvex computes these measures from the GitHub, GitLab and Jira history your teams already produce, with the deployment and lead-time definitions stated rather than assumed.