Glossary
Cycle time
Cycle time is the elapsed time from work starting to that work being finished, and in engineering analytics it most often means the pull-request lifecycle from first commit or open through review, rework and merge.
Definition
Cycle time: Cycle time is the elapsed time from work starting to that work being finished, and in engineering analytics it most often means the pull-request lifecycle from first commit or open through review, rework and merge.
In practice
How Cycle time is used
Cycle time comes from lean manufacturing, where it describes how long a unit takes to move through a process once work on it has begun. Applied to software, the awkward part is deciding when work "begins": at the first commit, when the branch is pushed, when the pull request opens, or when the ticket moves to In Progress. Each choice produces a different number, and comparing cycle time across tools without checking the start event is a reliable way to reach a wrong conclusion.
The reason cycle time is the most actionable delivery metric is that it decomposes cleanly. A single number tells you the system is slow; the breakdown tells you which part is slow, and the parts have completely different remedies. Waiting for a first review is a scheduling and ownership problem. A long review phase is often a pull-request size problem. Heavy rework points at unclear requirements or late architectural feedback. A long gap between approval and merge is usually a CI or release-process problem.
In almost every team that measures it honestly, the majority of cycle time is waiting rather than working. That is the single most useful thing the metric reveals, because it redirects improvement effort away from "write code faster" — which nobody can do on command — and towards queues, which respond to policy changes within a sprint.
Cycle time is not a productivity score for individuals. It is a property of a system that includes reviewers, CI capacity, on-call load and the size of the work being submitted, most of which the author does not control. Ranking engineers by cycle time reliably produces smaller pull requests that hide more, and reviewers who approve without reading.
Marvex breaks pull-request cycle time into first response (pickup), review, rework and merge time, per repository and per team, so a regression can be attributed to a stage rather than to a person.
Quick answer
What is Cycle time?
Related terms
Marvex