Lead time for changes
Lead time for changes is a DORA metric measuring the elapsed time from a code change being committed to that change running in production, capturing everything the change waits for along the way.
Definition
Lead time for changes: Lead time for changes is a DORA metric measuring the elapsed time from a code change being committed to that change running in production, capturing everything the change waits for along the way.
In practice
How Lead time for changes is used
Lead time for changes starts at first commit and ends at production release. That span deliberately includes waiting: time in review queues, time waiting for CI, time sitting on a merged branch waiting for a release window. Those queues are usually where the bulk of the elapsed time lives, which is why the metric is a better diagnostic of a delivery system than any measure of how long people spent typing.
It is frequently confused with cycle time, and the confusion is worth resolving. Lead time for changes, as DORA defines it, is commit-to-production. Cycle time, in most engineering-analytics tools including this one, is the pull-request lifecycle — from the moment work becomes reviewable to the moment it merges. Cycle time is a component of lead time, and a team can have excellent cycle time and terrible lead time if merged code then waits two weeks for a release train.
The metric is skewed by definition, so the median and the 85th or 95th percentile tell you more than the mean. A handful of changes that sat unmerged over a holiday will drag an average into meaninglessness while the median stays honest. Percentiles also answer the question stakeholders actually ask, which is not "how long does a change usually take" but "how long before I can be confident it has shipped".
Improving lead time is almost always a matter of removing waits rather than adding effort. Smaller pull requests, review SLAs, automated checks that finish in minutes instead of hours, and shipping on merge rather than on a schedule all attack elapsed time directly.
Marvex measures lead time from your Git provider timestamps and decomposes the pull-request portion of it into first response, review, rework and merge, so a long lead time can be attributed to a specific stage instead of being reported as one opaque number.