Solutions
Solutions
The same delivery data, read for a different job. Pick the role you hold or the problem you are trying to move.
An index of the Marvex solution pages, organised by role — engineering managers, VPs and directors, CTOs, platform teams, scrum masters — and by the delivery problem being solved.
By role
What the delivery data is useful for depends on how far from the code you sit. These pages start from the question each role is actually asked.
By need
Start from the problem instead. Each of these pages names what to measure first, what the measurement can and cannot tell you, and which fixes apply to which stage.
Frequently asked questions
What does Marvex do?
Marvex is an engineering intelligence platform. It computes the four DORA metrics — deployment frequency, lead time for changes, change failure rate and mean time to recovery — from your own GitHub or GitLab repositories, CI workflow runs and recorded incidents; breaks pull request cycle time into first-response or pickup, review, rework and merge time; and reports sprint analytics from Jira or from SALT, the issue tracker built into the product. It also tracks GitHub Copilot and Claude Code adoption next to those delivery outcomes.
How are the Marvex solution pages organised?
Two ways. By role, for people whose question is "what does this show me": engineering managers, VPs and directors of engineering, CTOs, platform and developer productivity teams, and scrum masters. By need, for people whose question is a problem: improving delivery speed, reducing pull request cycle time, improving code review, improving sprint predictability, and measuring the impact of AI coding tools. The same underlying data feeds all of them; the pages differ in which parts of it are useful to whom.
Do I need Jira to use Marvex?
No. Jira is supported as an integration for issues, sprints and boards, but Marvex also ships SALT (Smart Agile Lifecycle Tracker), which provides issues, boards, backlogs, sprints, workflows, issue history and webhooks inside the product. Sprint analytics and sprint reports work from either source, and in both cases sprint data can be read against the pull requests and deployments that the sprint produced.
Which tools does Marvex connect to?
GitHub and GitLab for repositories, pull requests, reviews, commits and CI/CD workflow runs; Jira for issues, sprints and boards; GitHub Copilot and Claude Code for AI adoption and authorship data; and Slack and WhatsApp for Velo, the built-in AI assistant. Incidents feed change failure rate and mean time to recovery. Every integration is scoped to your organisation, and integration tokens and assistant chat content are encrypted at rest.
Can Marvex be used to rank individual engineers?
It is not built for that, and using delivery metrics as individual performance scores reliably corrupts the metrics — the behaviours that improve a number are cheaper than the behaviours that improve delivery. Marvex analyses changes and teams, with dashboards rolling up per team and per organisation. Where individual attribution exists it is deliberately broad: "PR worked on" counts any member who authored at least one non-merge commit in a pull request, which is not the same as being its author, so collaborators are not erased.
How does Marvex decide what counts as a deployment?
One of two ways, configured per team. PR_MERGE treats a merge into a nominated production branch as a deployment. WORKFLOW treats a CI/CD workflow run as the deployment. The choice determines whether deployment frequency and lead time describe release behaviour or a branching convention: a team that ships from a pipeline but merges to main weekly will look like a weekly deployer under PR_MERGE, and a team with no separate release pipeline will look inert under WORKFLOW.
Where should I start if delivery feels slow?
With the stage breakdown rather than a headline number. Look at several weeks of merged pull requests and find which of the four stages — first response or pickup, review, rework, merge — holds the largest share of elapsed time, because each has a different fix. Long pickup is an ownership and routing problem, long review on small changes is reviewer attention, repeated rework means the approach was not agreed before implementation, and long merge time after approval is usually CI duration or branch protection.
Marvex
See it on your own delivery data
Connect GitHub, GitLab or Jira and Marvex builds your DORA, cycle-time and sprint views from the history you already have.