Skip to content
Marvex

By need

Improve Engineering Delivery Speed

Before you hire, reorganise or ask for more hours, find out how much of your delivery time is people working and how much is work waiting.

A practical approach to improving software delivery speed by locating queues — waiting time between stages — using stage-level pull request data and DORA metrics rather than increasing pressure on engineers.

A delivery analytics dashboard showing trends over time on a laptop screen

Definition

The problem: We are told we need to move faster, and every proposal on the table is about making people work harder or hiring more of them.

What changes

  • Know what proportion of delivery time is waiting rather than working
  • Locate the specific stage where changes queue
  • Reduce batch size deliberately rather than as a slogan
  • Move throughput without quietly trading away stability

What Marvex measures here

4
Cycle time stages measured per pull request: pickup, review, rework, merge
2
Throughput metrics: deployment frequency and lead time for changes
2
Stability guardrails to read alongside them: change failure rate and mean time to recovery

Delivery time is mostly waiting

When a change takes nine days to reach production, the instinctive model is that it took nine days of work. Measure it stage by stage and the shape is usually different: a few hours of authoring, a long wait for a first review, a short review, another wait, a rework loop, then a wait for CI and a release window.

This matters because the two models suggest opposite interventions. If the time is work, you need more people or more hours. If the time is waiting, more people can make it worse — more concurrent changes means more items in every queue, and queues lengthen faster than they fill.

So the first measurement is not "how fast are we", it is "how much of our elapsed time has anyone actually touching it". Marvex splits every pull request into first-response or pickup, review, rework and merge time, which is what makes that split visible instead of theoretical.

Find the queue before you change anything

The queue is rarely where the loudest complaint is. Teams complain about review being slow when the data often shows review itself is quick and the wait before review is long — a pickup problem, not a review problem. Teams complain about CI when merge time is a small fraction of the total. Fixing the wrong stage is expensive and, worse, discredits the next proposal.

The check is arithmetic. Take a few weeks of merged pull requests, look at the stage breakdown, and find the stage holding the largest share of elapsed time. Then look at whether it is a level problem (everything is slow) or a tail problem (most changes are fine and a few sit for a week). The tail case is usually more tractable, because a small number of pull requests are dominating the average and they often share a cause: one repository, one reviewer group, one kind of change.

Only after that does an intervention make sense. Pickup problems get fixed by ownership and routing. Review problems by change size and reviewer load. Rework by getting agreement on approach before implementation. Merge by pipeline and branch protection work.

  • Measure the stage split before proposing a fix
  • Distinguish a level problem from a tail problem — the tail is usually cheaper to fix
  • Check whether the slow changes cluster by repository, reviewer or change type
  • Re-measure after the change, on the same definitions

Deployment frequency is really a batch-size metric

Deployment frequency is usually read as a speed metric, and it is more useful read as a batch-size metric. Deploying once a fortnight does not mean the work took a fortnight; it means two weeks of changes are shipped together.

Large batches are expensive in ways that show up elsewhere. Review is harder because the diff is bigger. Failure diagnosis is harder because more changed at once. Rollback is coarser because you cannot revert one part. This is why deployment frequency and change failure rate tend to be related: the same batching that slows you down also makes each release riskier.

The practical implication is that increasing deployment frequency is not primarily about deploying more often. It is about making smaller changes, which means work decomposition, feature flags and trunk-based practices. The deploy count is the indicator, not the lever.

Speed without stability is not speed

Any throughput push can be faked by lowering the bar — shallower review, fewer tests, less staging. The metrics that catch it are change failure rate and mean time to recovery, which is why they should always be on the same page as deployment frequency and lead time.

The DORA and Accelerate research programme reported that the two dimensions tend to move together in their sample: the groups with the highest throughput also tended to have lower change failure rates and faster recovery, rather than trading one for the other. That is a finding from that research programme, not a promise about your organisation, but it sets a useful expectation — if your throughput is improving while stability degrades, you probably have not improved the system, you have shifted the cost.

In Marvex both dimensions come from the same connected data: deployments detected from merges to a production branch or from CI/CD workflow runs, and change failure rate and recovery time computed against recorded incidents.

  • Never present a throughput gain without the stability metrics next to it
  • A rising change failure rate alongside rising deploy frequency means risk moved, not reduced
  • Recovery time is the metric that makes deploying often survivable

A four-week way to start

Week one is baselining only, with no targets. Connect GitHub or GitLab, confirm each team's deployment detection matches how it actually ships, and let the stage breakdown and the four DORA metrics populate. Resist reacting to the first chart.

Week two, pick one stage and one team. The stage should be the one holding the largest share of elapsed time; the team should be one that wants to try. Agree a single change — a review rota, a pull request size guideline, a CI fix — and write down which metric it should move.

Weeks three and four, run it and re-measure on the same definitions. The result is either a movement you can point at or a null result that tells you the constraint is somewhere else. Both are progress, and both are more useful than a broad initiative measured by whether people feel faster.

Frequently asked questions

Why does adding engineers often fail to improve delivery speed?

Because most delivery elapsed time is waiting rather than working. When a change spends hours being authored and days waiting for review, CI or a release window, adding people adds more concurrent changes to the same queues, and queue length grows faster than capacity does. Measuring the stage breakdown first — how much time is pickup, review, rework and merge — tells you whether the constraint is capacity or flow. If it is flow, reducing work in progress and shrinking change size will do more than hiring.

How do I find the bottleneck in our delivery pipeline?

Take several weeks of merged pull requests and compare elapsed time across the four stages — first response or pickup, review, rework, and merge — then find the stage holding the largest share. Next check whether it is a level problem, where everything is slow, or a tail problem, where most changes are fine and a few sit for a week. Tail problems are usually cheaper to fix because the slow changes tend to cluster around one repository, one reviewer group or one type of change.

Is deployment frequency a speed metric?

It is better understood as a batch-size metric. Deploying once a fortnight does not mean work took a fortnight; it means two weeks of changes ship together. Large batches make review harder, failure diagnosis harder and rollback coarser, which is why low deployment frequency and elevated change failure rate often appear together. Increasing deployment frequency therefore comes mostly from making changes smaller — decomposition, feature flags, trunk-based practices — rather than from deploying the same batches more often.

Does going faster mean breaking more things?

Not necessarily. The DORA and Accelerate research programme reported that throughput and stability tended to move together in their sample: groups with the highest deployment frequency and shortest lead times also tended to have lower change failure rates and faster recovery. That is a finding from that research programme rather than a guarantee for any single organisation. The practical rule is to always read deployment frequency and lead time alongside change failure rate and mean time to recovery — if throughput improves while stability degrades, cost has been moved rather than removed.

What is the fastest delivery improvement to make first?

Usually reducing first-response time on pull requests, because it is pure queueing: nobody is working on the change while it waits, so the fix is organisational rather than technical. A review rota, an explicit expectation for first response, or clearer reviewer routing typically moves it within a sprint or two. The second cheapest is reducing pull request size, since smaller changes tend to be picked up and reviewed sooner and produce fewer rework rounds.

How long before a delivery speed change shows up in the metrics?

Pickup and review time respond quickly — often within one or two sprints, because they are measured per pull request and a routing or rota change affects the next one. Lead time for changes moves more slowly because it spans the whole path to production. Deployment frequency and change failure rate are the slowest, since they depend on batching and release practice changing. Expect a few weeks for stage-level signals and a quarter before the DORA trend is worth reporting.

Marvex

Put this in front of your engineering leaders under pressure to ship faster

Connect GitHub, GitLab or Jira and Marvex builds your DORA, cycle-time and sprint views from the history you already have.