Industries
Industries
Every sector has something that bends its delivery data — a freeze, a regulator's date, a shared release train, a validation gate, a mixed estate. These pages start there.
An index of the Marvex industry pages — e-commerce and logistics, fintech, SaaS, healthcare and enterprise IT — each covering the delivery constraints that change how DORA and cycle-time data should be read in that sector.
By industry
The four delivery metrics are computed the same way everywhere. What differs is what they end up describing: in a freeze-bound or heavily governed environment, deployment frequency and lead time report a release policy rather than an engineering team. Each page below names the constraint first, then says which measurements survive it.
Frequently asked questions
Do DORA metrics mean the same thing in every industry?
The definitions do; what they describe does not. Deployment frequency, lead time for changes, change failure rate and mean time to recovery — the four metrics identified by the DORA research programme — are computed the same way everywhere, but in a regulated or freeze-bound environment they frequently describe a release policy rather than an engineering team. A code freeze, a change advisory board, a validation gate or an out-of-hours-only release window all cap deployment frequency by decision rather than by capability. The metric is still worth having: it names the constraint. It just should not be read as a verdict on the team working underneath it.
Which metric holds up best when release policy is out of the team's hands?
Cycle time from pull request open to merge. It ends at the merge, so it excludes the wait for a release window, a change board or a train, which makes it the fairest read of engineering throughput when deployment timing is set elsewhere. Marvex splits that span into pickup (the wait for a first response), review, rework and merge time. Pull request size and review depth are equally robust for the same reason. Deployment frequency and lead time for changes are the ones that absorb release policy, so they are best reported alongside a note about what policy was in effect.
How do you measure the cost of a change approval process?
Measure the span between a change being merged and the same change reaching production, separately from the engineering time before the merge. That gap is where a change advisory board, a release calendar or a validation step becomes visible. The diagnostic signal is correlation: when that span is long for many unrelated teams at once, the shared process is the cause rather than any team's practice. The point of the measurement is to put a price on the control so its owner can see it, not to argue the control should be removed — one that adds four hours is inexpensive, one that adds three weeks across a portfolio is not.
Which industries does Marvex publish guidance for?
Five, each written around a different delivery constraint: e-commerce and logistics, where peak-season code freezes bend every metric and the post-freeze release is the largest of the year; fintech, where compliance dates are fixed and review is a control as well as a quality practice; SaaS, where several squads ship into one shared deployable so deployment frequency belongs to the release train rather than to any team; healthcare, where validation and change control usually consume more calendar time than engineering does; and enterprise IT, where a mixed GitHub and GitLab estate makes comparability the hard problem rather than collection.
What does Marvex actually connect to?
GitHub and GitLab for repositories, pull requests, reviews, commits and CI/CD workflow runs; Jira for issues, sprints and boards, or SALT — the Smart Agile Lifecycle Tracker built into the product — for teams that do not use Jira; GitHub Copilot seat and usage data and Claude Code authorship for AI adoption tracking; and Slack and WhatsApp for Velo, the built-in AI assistant. Incidents feed change failure rate and mean time to recovery. Marvex reads engineering delivery metadata and is not deployed in the path of application traffic.
How is data separated between organisations?
Marvex is multi-tenant and every query is scoped to an organisation, so one organisation's delivery data is not reachable from another. Integration tokens and assistant chat content are encrypted at rest. This describes the mechanism rather than asserting a compliance certification: what a regulated buyer's own governance requires of a vendor is a question for their compliance function, not something a metrics platform can answer on their behalf.
How does Marvex decide what counts as a deployment?
One of two ways, configured per team. PR_MERGE treats a merge into a nominated production branch as the deployment. WORKFLOW treats a CI/CD workflow run as the deployment. The choice matters most exactly where industry constraints bite: if a freeze or a release train holds pipeline runs while merges continue, PR_MERGE will report deployments that no customer has received. Teams measured under different modes should not have their deployment frequency compared directly, because the difference would be a configuration artefact rather than a finding.
Marvex
See it on your own delivery data
Connect GitHub, GitLab or Jira and Marvex builds your DORA, cycle-time and sprint views from the history you already have.