Skip to content
Marvex

By industry

Marvex for Enterprise IT

Two source-control platforms, several delivery partners, a quarterly change calendar and forty teams with forty definitions of done. The reporting problem is not collecting the data — it is knowing which numbers may honestly be put beside each other.

How enterprise IT organisations use Marvex to build a comparable delivery picture across a mixed GitHub and GitLab estate with in-house and vendor teams, without pretending teams on different processes are directly rankable.

Rows of server racks in a data centre aisle

Delivery pressures

What makes delivery hard here

  • A mixed estate — GitHub in one part of the organisation, GitLab in another, usually the residue of acquisitions or long-running divisional autonomy
  • In-house teams and delivery partners contributing to the same repositories under different working agreements
  • ITIL-style change management with approval boards and a release calendar set outside engineering
  • Legacy systems with no CI pipeline sitting next to modern services with full automation
  • Portfolio-level reporting obligations to a CIO who needs comparison, not forty separate dashboards
  • Migration and modernisation programmes whose progress is asserted in slideware and rarely evidenced in delivery data

With Marvex

What teams get to see

  • Read GitHub and GitLab teams in one place without normalising away their real differences
  • See vendor and in-house contribution to the same repository, by actual commit authorship
  • Quantify what the change calendar adds to lead time across the portfolio
  • Give the CIO a rollup that is defensible when someone asks how the numbers were derived
  • Evidence a modernisation programme with delivery data instead of a status colour
2
Source-control providers read side by side: GitHub and GitLab
2
Planning sources: Jira, or SALT built into the product for teams that do not use it
2
Deployment detection modes, so a legacy team and a pipeline team can each be measured correctly

A mixed estate is a comparability problem, not a collection problem

Large IT organisations rarely have one of anything. GitHub arrived with one acquisition and GitLab with another; one division runs Jira and another does not; three teams have full CI and a fourth deploys by a documented manual runbook. Pulling all of that into one place is the easy half — Marvex reads GitHub and GitLab side by side, and Jira or SALT for planning.

The hard half is deciding which numbers may honestly be placed beside each other. Deployment frequency is the obvious trap: Marvex detects a deployment either as a merge into a production branch (PR_MERGE) or as a CI/CD workflow run (WORKFLOW), and a team measured one way is simply not comparable to a team measured the other. Put them in the same league table and you have manufactured a finding out of a configuration difference.

The workable approach is to be explicit about which teams share a definition, compare inside those groups, and use metrics that survive the differences when comparing across them. Cycle time from pull request open to merge is robust: it means the same thing regardless of how a team deploys, because it stops before deployment is involved at all.

  • Record the deployment detection mode per team and publish it next to the numbers
  • Compare deployment frequency only within groups that share a detection mode
  • Cycle time, pull request size and review depth compare cleanly across the whole estate
  • A league table across incompatible definitions is worse than no league table

Vendor and in-house contribution to the same repository

Where delivery partners work alongside internal engineers, a recurring question from the sponsoring side is simply who is doing what. It is usually answered from invoices and status reports, both of which describe intent, and rarely from the repository, which describes what happened.

Marvex distinguishes the pull request author from "PR worked on" — a member who authored at least one non-merge commit in that pull request. The two are not the same, and the difference is exactly where mixed-team dynamics show up: a change opened and merged by an internal lead may contain commits from three partner engineers, or the reverse.

A caution worth stating plainly. This data describes distribution of work, and it is the wrong instrument for judging individuals or for settling a commercial dispute. Commit counts do not measure difficulty, and a partner team assigned the harder or less glamorous half of a system will look worse on any volume measure while doing more valuable work. Use it to understand how work spread across a repository, and pair it with review depth and rework, which say more about how changes are actually landing.

  • "PR worked on" = authored at least one non-merge commit; distinct from the pull request author
  • Useful for understanding distribution of work across mixed teams
  • Not a commercial or performance instrument — commit counts do not measure difficulty
  • Read alongside review depth and rework rather than on its own

Put a number on the change calendar

Enterprise IT usually runs a formal change process with an approval board and a release calendar, and its cost in delivery time is almost never quantified — largely because the people who set it and the people who wait on it look at different systems.

It is directly measurable as the distance between a change being merged and the same change being deployed. Where that span is consistently long across many unrelated teams at once, the cause is not those teams: it is the calendar they all share. That is a genuinely useful finding, because it is one of the few delivery constraints in a large organisation that can be changed by a single decision rather than by forty separate improvement efforts.

Bring it as a measurement, not as an argument. A change process that adds a day is inexpensive control. One that adds three weeks to every change across a portfolio has a cost that ought to be visible to the person who owns the process, and in most organisations it simply never has been.

  • Merged-to-deployed time is where the change calendar becomes visible
  • A long span across many unrelated teams simultaneously indicts the process, not the teams
  • One decision on cadence can move portfolio lead time more than forty local improvements

Evidence a modernisation programme instead of asserting it

Migration and modernisation programmes are typically reported as percentage complete against a plan, which measures activity rather than effect. The claim underneath is nearly always about delivery: that the modernised system will be faster and safer to change than the one it replaces.

That claim is testable with the same four metrics on both sides. If the modernised service has a shorter lead time for changes, a lower change failure rate and a faster recovery time than the legacy one it replaced, the programme is delivering its stated benefit. If a year in the numbers look the same, that is worth knowing early, and it is exactly the kind of finding a status colour is designed not to surface.

The prerequisite is being able to read teams and services separately and then roll them up, which is what the team and org dashboards are for. Measuring both sides before the programme starts is what makes the comparison credible afterwards — a baseline taken retrospectively convinces nobody.

  • Baseline the legacy side before the programme starts, not after
  • Compare lead time, change failure rate and recovery time across old and new
  • Team dashboards for the working view, org dashboard for the portfolio rollup
  • Percentage-complete measures activity; the four metrics measure effect

AI adoption across an estate is a real question with a measurable answer

AI coding tooling is being bought at enterprise scale, and the question that follows is asked at exactly the level a portfolio dashboard is meant to serve: are these seats being used, and is delivery any different where they are?

Marvex reads GitHub Copilot seat and usage data and Claude Code authorship, and places them next to delivery outcomes for the same teams. The first-order answer is usually about utilisation and is often uncomfortable: a licence count is not an adoption number, and the gap between seats assigned and seats used is a straightforward procurement finding.

The second-order question — whether delivery outcomes differ where adoption is high — deserves caution. Teams that adopt new tooling early differ from teams that do not in several ways besides the tooling, so a difference in cycle time between them is a correlation and should be presented as one. What the data supports is a well-framed question and an honest comparison over time, not a causal claim about a tool.

  • GitHub Copilot seat and usage data, plus Claude Code authorship
  • Seats assigned versus seats used is the first and most actionable finding
  • Delivery differences between high and low adoption are correlational — present them as such
  • Compare the same team before and after, rather than different teams against each other

Reporting that survives the follow-up question

Portfolio reporting fails in a predictable way: a number reaches a steering committee, somebody asks how it was derived, and nobody in the room can answer. The number is then discounted, and so is every number that follows it.

The defence is provenance. Each metric should trace to a source system and a definition — this deployment frequency comes from CI/CD workflow runs in GitLab for these repositories, this lead time comes from commit to production deployment, this change failure rate comes from incidents recorded against these services. Marvex computes from your own repository, workflow, issue and incident data rather than from anything self-reported, which is what makes that trace possible.

Velo helps here more than it first appears. When a question surfaces mid-meeting, being able to ask it in Slack and get an answer from the same underlying data — DORA, pull request, team, Jira or incident — is often the difference between a number being trusted and a number being parked until the next quarter.

  • Every reported metric should name its source system and its definition
  • Computed from repository, workflow, issue and incident data, not from self-reporting
  • Velo answers follow-up questions in web, Slack or WhatsApp, from the same data
  • Org-scoped isolation; integration tokens and chat content encrypted at rest

Frequently asked questions

Can delivery metrics be compared across teams using GitHub and teams using GitLab?

Partially, and the distinction matters. Marvex reads both providers side by side, so collection is not the obstacle. Cycle time from pull request open to merge, pull request size and review depth compare cleanly across the whole estate because they describe the same events regardless of provider or deploy method. Deployment frequency does not compare cleanly unless the teams share a deployment detection mode, since Marvex can treat either a merge into a production branch or a CI/CD workflow run as the deployment. Record each team's mode, compare deployment frequency only within groups that share one, and publish the mode next to the number.

How can an enterprise see what a delivery partner actually contributed?

Through commit authorship rather than through status reporting. Marvex distinguishes the pull request author from "PR worked on", which means a member authored at least one non-merge commit in that pull request — so a change opened and merged by an internal lead but built by three partner engineers is visible as such. This describes the distribution of work, not its value: commit counts do not measure difficulty, and a partner team assigned the harder half of a system will look worse on any volume measure while doing more valuable work. It is not a suitable instrument for a commercial dispute.

How do you measure what an ITIL change process costs in delivery time?

Measure the span between a change being merged and the same change reaching production, which is where an approval board and a release calendar become visible. The diagnostic signal is correlation across teams: when that span is consistently long for many unrelated teams at once, the cause is the shared process rather than any team's engineering practice. That is a valuable finding in a large organisation because it is one of the few delivery constraints that a single decision on cadence can move, rather than requiring dozens of separate local improvement efforts.

How do you prove a modernisation programme is actually improving delivery?

Compare the same four metrics on both sides of the migration: lead time for changes, deployment frequency, change failure rate and mean time to recovery, for the legacy service and for the service replacing it. The underlying promise of most modernisation programmes is that the new system will be faster and safer to change, and that promise is directly testable. The prerequisite is baselining the legacy side before the programme starts — a baseline reconstructed afterwards convinces nobody — and being able to read teams and services separately, then roll them up for portfolio reporting.

What can Marvex tell an enterprise about AI coding tool adoption?

It reads GitHub Copilot seat and usage data and Claude Code authorship, and presents them next to delivery outcomes for the same teams. The most immediately actionable finding is usually utilisation: a licence count is not an adoption number, and the gap between seats assigned and seats actually used is a straightforward procurement question. Whether delivery outcomes differ where adoption is higher is a more careful question — teams that adopt tooling early differ in other ways too, so any difference is correlational and should be presented as such, ideally by comparing the same team over time rather than different teams against each other.

How do you keep portfolio delivery metrics credible with a steering committee?

By giving every number a traceable provenance. Each metric should name its source system and its definition — this deployment frequency comes from CI/CD workflow runs in GitLab for these repositories, this lead time runs from commit to production deployment, this change failure rate comes from incidents recorded against these services. Marvex computes from your own repository, workflow, issue and incident data rather than from anything self-reported, which is what makes that trace possible. A number that cannot survive "how was this derived" discredits every number presented after it.

What if some teams in the estate do not use Jira?

They can use SALT, the Smart Agile Lifecycle Tracker built into Marvex, which provides issues, boards, backlogs, sprints, workflows, issue history and webhooks inside the product. Teams that already run Jira can connect it for issues, sprints and boards. A mixed estate can run both, with different teams on different planning sources, because the delivery metrics derived from source control and CI/CD do not depend on which tracker a given team uses.

Marvex

See it on your own delivery data

Connect GitHub, GitLab or Jira and Marvex builds your DORA, cycle-time and sprint views from the history you already have.