The regulator's date does not move. Your review queue does. When a mandated change lands late, the post-mortem needs to say which of those two consumed the calendar — and the answer is already in your pull request timestamps.
How fintech engineering teams use Marvex to separate engineering time from approval time on regulated changes, evidence review depth from the pull request record, and keep mean time to recovery honest on money-moving systems.
Delivery pressures
What makes delivery hard here
- Externally fixed compliance dates — a mandated change window is not negotiable in the way a product date is
- Four-eyes review and segregation-of-duties requirements that make review a control, not just a quality practice
- Change advisory boards and release approval steps that sit between an approved pull request and production
- Audit questions asked months later about who reviewed what, and when
- Money-movement and reconciliation paths where a defect creates a financial exposure, not just a bug
- Restricted production access, so the people who can diagnose fastest are not always the people who can deploy
With Marvex
What teams get to see
- Split lead time into engineering time and approval time, so a slipped compliance date has an identified cause
- Evidence review depth from the pull request record you already keep, instead of a parallel spreadsheet
- See whether the change board is adding hours or days between approval and production
- Read recovery time on money-moving services separately from the rest of the estate
- Answer "why was this late" with a timeline rather than a recollection
A compliance date is a fixed point. Everything else is the variable
Most engineering delivery pressure is negotiable at the margin — a feature slips a sprint, a launch moves two weeks. A regulatory cutover is not that. The date arrives whether the change is ready or not, which inverts the usual planning conversation: instead of estimating when work will finish, you are working backwards from a fixed point and asking what has to be true along the way.
That makes the internal delays the thing worth measuring, because they are the only part you control. If a mandated change needs six weeks of engineering and your organisation reliably adds three weeks of review, approval and release scheduling on top, then a nine-week runway is the real number and a six-week plan is a plan to be late.
The data to establish that already exists. Marvex measures cycle time as four separate spans — pickup (the wait for a first response), review, rework, and merge time — and the shape of those four across your last few regulated changes is a far better predictor of the next one than anybody's estimate.
- Work backwards from the fixed date through your measured approval overhead, not through an estimate of it
- Pickup time is the purest queue in the system: nobody is working and the clock is running
- Merge time after approval is where change boards and release windows show up
- Rework rounds on a regulated change usually mean the interpretation of the requirement was not settled first
Review as a control, measured as one
In most software organisations code review is a quality practice. In a regulated fintech it is frequently also a control: a documented second pair of eyes, performed by somebody who did not write the change. The practice is the same. The evidentiary requirement is not.
The useful consequence is that the record you need mostly already exists inside your source control. Who opened a change, who reviewed it, how many review rounds it went through, what came back afterwards as rework, and when it merged, are all events with timestamps. Marvex reads them from GitHub or GitLab and presents them as review depth and rework alongside the timings, so the question "was this change reviewed meaningfully" has an answer that is not a memory.
One distinction is worth being precise about when segregation of duties is in play. Marvex tracks both the pull request author and "PR worked on" — a member who authored at least one non-merge commit in that pull request. Those are not the same set of people. A change opened by one engineer can contain commits from two others, and only the second signal shows it.
- Review depth and rework are derived from the review and commit events themselves
- "PR worked on" = authored at least one non-merge commit; distinct from being the pull request author
- Approval-to-merge time is the part of review that is queueing rather than reviewing
- Marvex reports on this record; it is not itself an audit or compliance certification
Find out what the change board actually costs
Almost every regulated engineering organisation has a step between "the change is approved by engineers" and "the change is in production" — a change advisory board, a release window, a manual approval, a scheduled train. Almost none of them can say what that step costs in elapsed time, because nobody measures the same span twice.
It is directly observable. Merge time, in the Marvex breakdown, is the span between a change being approved and the code actually landing, and lead time for changes carries the rest of the way to production. If a change is approved on Tuesday and reaches production the following Thursday, nine of those days are not engineering — and whether that is nine days of genuine risk control or nine days of calendar friction is a conversation worth having with the number in front of you.
This is not an argument for removing the control. It is an argument for knowing its price. A board that adds four hours is cheap insurance. A board that adds nine days on a change with a fixed regulatory deadline is consuming a fifth of a typical runway, and the people who set the deadline are not aware they are paying for it.
- Approved-to-merged and merged-to-deployed are separate spans; measure both
- A weekly release window adds an average of half a week to every change that misses it
- Take the cost of the control to the people who own the control, not to the engineers waiting on it
Recovery time on money-moving systems is its own number
Averaging mean time to recovery across an entire fintech estate produces a number that describes neither half of it. A marketing site and a payment authorisation service have different tolerances, different escalation paths and usually different deploy processes, and rolling them together hides the one you actually care about.
Marvex computes DORA metrics per team, and rolls teams up to the org level, which is what makes this tractable: the team that owns settlement can be read separately from the team that owns the customer portal, and the rollup still exists for the board slide. Incidents are the input to both mean time to recovery and change failure rate, so the same separation carries into stability as well as speed.
When you look at the slow recoveries specifically, the cause in a regulated environment is often access rather than diagnosis. If production access is restricted — appropriately — to a small group, then recovery time includes the time to reach one of them. That is a real constraint with real reasons behind it, and it belongs in the incident review as a known cost rather than being quietly attributed to slow debugging.
- Compute recovery time per team, not as a single estate-wide average
- Restricted production access is a legitimate control that shows up as recovery time — name it as such
- Change failure rate and MTTR share the same incident input, so the split is consistent across both
Data handling
Marvex reads delivery metadata: repositories, pull requests, reviews and workflow runs from GitHub or GitLab, and issues, sprints and boards from Jira, or from SALT if planning happens inside Marvex. It sits alongside your engineering systems rather than in the path of any transaction.
The platform is multi-tenant and every query is scoped to an organisation, so one organisation's delivery data is not reachable from another. Integration tokens and chat content are encrypted at rest.
Two things this page deliberately does not claim: Marvex is not an audit tool, and nothing here is a statement about your regulatory obligations. It measures and reports on the engineering record. What that record needs to demonstrate is a question for your compliance function, not for a metrics platform.
- Delivery metadata from GitHub, GitLab, Jira, GitHub Copilot, Claude Code, Slack and WhatsApp
- Org-scoped multi-tenant isolation on every query
- Integration tokens and chat content encrypted at rest
- Not an audit or certification product — a measurement one
Frequently asked questions
How do you plan engineering work backwards from a fixed regulatory deadline?
Can pull request data evidence that a change was properly reviewed?
What is the difference between a pull request author and "PR worked on" in Marvex?
How can you measure what a change advisory board costs in delivery time?
Should mean time to recovery be measured across a whole fintech estate?
What data does Marvex hold, and how is it isolated?
Does measuring delivery metrics encourage engineers to game them?